Violation Detail
Standard Cited: 19100147 C04 II The control of hazardous energy (lockout/tagout).
Inspection Nr: 1695679.015
Citation: 01003
Citation Type: Serious
Abatement Status: Not Completed - AD Discretion
Initial Penalty: $12,421.00
Current Penalty: $9,000.00
Issuance Date: 02/28/2024
Nr Instances: 4
Nr Exposed: 4
Abatement Date: 04/01/2025
Gravity: 10
Report ID: 0521100
Contest Date: 03/21/2024
Final Order: 12/26/2024
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 12/26/2024 | $9,000.00 | 04/01/2025 | Serious | |
Penalty | C: Contested | 03/22/2024 | $12,421.00 | 04/03/2024 | Serious | |
Penalty | Z: Issued | 02/28/2024 | $12,421.00 | 04/03/2024 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.147(c)(4)(ii): The procedures shall clearly and specifically outline the scope, purpose, authorization, rules, and techniques to be utilized for the control of hazardous energy, and the means to enforce compliance including, but not limited to, 29 CFR 1910.147(c)(4)(ii)(A), (c)(4)(ii)(B), (c)(4)(ii)(C), and (c)(4)(ii)(D). At an establishment located at 5215 Mill Road in Laona, Wisconsin; (a) On or about September 11, 2023, in Plant B, employees were required to perform setup, maintenance, and servicing tasks on the Ogden Group Eco Power Plus, the procedures did not clearly and specifically outline the scope, purpose, authorization, rules, and techniques nor did the procedure identify all energy sources, pneumatic, to be de-energized for the control of hazardous energy, and the means to enforce compliance. (b) On or about September 5, 2023, in Plant A and Plant B, employees were required to perform setup, clearing jams, maintenance, and servicing tasks on the Hasko FSM MatchMaster, the procedures did not clearly and specifically outline the scope, purpose, authorization, rules, and techniques nor did the procedure identify how to verify all energy sources were de-energized for the control of hazardous energy, information regarding the coasting time for cutterheads and spindles to come to a stop, and the means to enforce compliance. (c) On or about September 21, 2023, in Plant B, employees were required to perform cleaning, maintenance, and servicing tasks on The Union Hot Melt Roller Coater, the procedures did not clearly and specifically outline the scope, purpose, authorization, rules, and techniques nor did the procedure identify all energy sources, thermal and pneumatic energy, the location to de-energize each energy source, steps to verify de-energization, and the means to enforce compliance. (d) On or about September 21, 2023, in Plant B, employees were required to perform cleaning, maintenance, and servicing tasks on The Union Tool Corporation Laminate Press, the procedures did not clearly and specifically outline the scope, purpose, authorization, rules, and techniques nor did the procedure identify all energy sources, thermal energy, pneumatic energy source and location to de-energize, steps to verify de-energization, and the means to enforce compliance.