Violation Detail
Standard Cited: 19260950 D01 General.
This violation item has been deleted.
Inspection Nr: 1690070.015
Citation: 01003
Citation Type: Serious
Abatement Date: 03/01/2024
Initial Penalty: $12,421.00
Current Penalty: $0.00
Issuance Date: 02/05/2024
Nr Instances: 1
Nr Exposed: 8
Related Event Code (REC):
Gravity: 10
Report ID: 0626700
Contest Date:
Final Order: 04/01/2024
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/01/2024 | $0.00 | 03/01/2024 | Serious | |
Penalty | Z: Issued | 02/05/2024 | $12,421.00 | 03/01/2024 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1926.950(d)(1): The nominal voltages of lines and equipment was not determined before work on or near the lines or equipment was started: a) On or about August 9, 2023, the nominal voltages of overhead powerlines was not determined prior to operating an excavator beneath the lines, exposing employees to electrical hazards.