Violation Detail
Standard Cited: 19100219 C04 I Mechanical power-transmission apparatus.
Inspection Nr: 1672017.015
Citation: 01003
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,813.00
Current Penalty: $0.00
Issuance Date: 06/21/2023
Nr Instances: 2
Nr Exposed: 1
Abatement Date: 06/27/2023
Gravity: 5
Report ID: 0213100
Contest Date:
Final Order: 07/12/2023
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 07/12/2023 | $0.00 | 06/27/2023 | Serious | |
| Penalty | Z: Issued | 06/21/2023 | $7,813.00 | 06/27/2023 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.219(c)(4)(i):Unguarded projecting shaft end(s) did not present a smooth edge and end and projected more than one half the diameter of the shaft: a) Building D Scrap Conveyor - On or about January 4, 2023, an employee was exposed to caught-in hazards due to working near projecting shaft ends on the scrap conveyor. b) Building D Pallet Conveyor - On or about January 4, 2023, an employee was exposed to caught-in hazards due to working near a projecting shaft end on a pallet conveyor.