Violation Detail
Standard Cited: 19100305 G02 II Wiring methods, components, and equipment for general use.
Inspection Nr: 1659063.015
Citation: 01003
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $8,929.00
Current Penalty: $15,000.00
Issuance Date: 09/21/2023
Nr Instances: 1
Nr Exposed: 10
Abatement Date: 10/03/2023
Gravity: 5
Report ID: 0316700
Contest Date: 10/05/2023
Final Order: 06/24/2024
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 06/24/2024 | $15,000.00 | 10/03/2023 | Serious | |
Penalty | C: Contested | 10/17/2023 | $8,929.00 | 10/03/2023 | Serious | |
Penalty | Z: Issued | 09/21/2023 | $8,929.00 | 10/03/2023 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.305(g)(2)(ii): Flexible cords were not used in continuous lengths without splice or tap: a. Basement of building 1 line tech locker room - On or about March 24, 2023, the flexible cords were spliced into the heat tape that was being used to warm the chocolate pipes run between building 1 and 2, the splices were done in such a manner that the outer insulation was not maintained to prevent contact with internal wiring. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.