Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
Inspection Nr: 1652702.015
Citation: 01003
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,813.00
Current Penalty: $3,906.50
Issuance Date: 08/22/2023
Nr Instances: 1
Nr Exposed: 8
Abatement Date: 09/18/2023
Gravity: 5
Report ID: 1032500
Contest Date:
Final Order: 09/21/2023
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/21/2023 | $3,906.50 | 09/18/2023 | Serious | |
Penalty | Z: Issued | 08/22/2023 | $7,813.00 | 09/18/2023 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.36(d)(1): Employee(s) were not able to open an exit route door from the inside at all times without keys, tools, or special knowledge: a) West Side of Production Building: On February 23, 2023 and at times prior to; an exit door was locked.