Violation Detail
Standard Cited: 19100305 G01 IV A Wiring methods, components, and equipment for general use.
Inspection Nr: 1639008.015
Citation: 01003
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $15,625.00
Current Penalty: $9,375.00
Issuance Date: 01/20/2023
Nr Instances: 4
Nr Exposed: 3
Abatement Date: 03/09/2023
Gravity: 10
Report ID: 0420600
Contest Date:
Final Order: 02/14/2023
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 02/14/2023 | $9,375.00 | 03/09/2023 | Serious | |
Penalty | Z: Issued | 01/20/2023 | $15,625.00 | 03/09/2023 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.305(g)(1)(iv)(A): Flexible cords and/or cables were used as a substitute for the fixed wiring of a structure: (a) On or about 12/13/2022, at 1402 Innisbrook Dr, Palm Harbor, FL. golf cart parking barn, employees were exposed to electric shock hazards in that extension cords and power strips had been used as permanent wiring.