Violation Detail
Standard Cited: 19260451 F04 General requirements.
Inspection Nr: 1631789.015
Citation: 01003
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $0.00
Current Penalty: $15,625.00
Issuance Date: 05/01/2023
Nr Instances: 1
Nr Exposed: 3
Abatement Date:
Gravity: 10
Report ID: 0215600
Contest Date: 05/11/2023
Final Order: 03/11/2024
Related Event Code (REC): A
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | R: Review Commission | 03/11/2024 | $15,625.00 | Serious | ||
Penalty | C: Contested | 05/15/2023 | $0.00 | Serious | ||
Penalty | Z: Issued | 05/01/2023 | $0.00 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1926.451(f)(4): Damaged or weakened parts of a scaffold were not immediately repaired or replaced, braced, or removed from service until repaired: A). On or about 11/01/2022, Rehabilitation of Roosevelt Ave Bridge Over Van Wyck Expressway. Flushing, NY Employees working from a scaffold referred as a temporary shielding approximately 13 feet above the Van Wyck Expressway were exposed to a fall hazard. A double channel steel support beam was displaced approximately 1 foot to the east on the underside of the shields. The end of three planks were not supported by the beam and were not immediately repaired or replaced.