Violation Detail
Standard Cited: 19260600 A03 I Equipment.
Inspection Nr: 1626928.015
Citation: 01003
Citation Type: Serious
Abatement Date: 04/28/2023 2
Initial Penalty: $15,625.00
Current Penalty: $12,500.00
Issuance Date: 04/04/2023
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC): A
Gravity: 10
Report ID: 0625400
Contest Date:
Final Order: 05/04/2023
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 05/04/2023 | $12,500.00 | 04/28/2023 | Serious | |
Penalty | Z: Issued | 04/04/2023 | $15,625.00 | 04/28/2023 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1926.600(a)(3)(i):Heavy machinery, equipment or parts thereof, which were suspended or held aloft by slings, hoists, or jacks were not substantially blocked or cribbed to prevent falling or shifting before employees were permitted to work under or between them.