Violation Detail
Standard Cited: 19260416 A01 General requirements.
Inspection Nr: 1625030.015
Citation: 01003
Citation Type: Serious
Abatement Status: Not Completed - AD Discretion
Initial Penalty: $4,688.00
Current Penalty: $4,688.00
Issuance Date: 02/09/2023
Nr Instances: 1
Nr Exposed: 5
Abatement Date: 02/15/2023
Gravity: 10
Report ID: 0111700
Contest Date:
Final Order: 03/14/2023
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 02/09/2023 | $4,688.00 | 02/15/2023 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1926.416(a)(1): Employees were permitted to work in proximity to electric power circuits and were not protected against electric shock by de-energizing and grounding the circuits or effectively guarding the circuits by insulation or other means: Instance a. Site - On or about Sept. 28, 2022, employees were exposed to electrical shock hazards while working in close proximity to the electrical drop lines while engaged in roofing activities, where the lines were not de-energized or insulated to prevent the hazard. Instance b. Site - On or about Sept. 27, 2022, employees were exposed to electrical shock hazards while working in close proximity to the electrical drop lines while engaged in roofing activities, where the lines were not de-energized or insulated to prevent the hazard.