Standard Cited: 19100219 B01 Mechanical power-transmission apparatus.
Inspection Nr: 1622205.015
Citation: 01003
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $8,595.00
Current Penalty: $4,297.50
Issuance Date: 03/13/2023
Nr Instances: 2
Nr Exposed: 2
Abatement Date: 04/26/2023
Gravity: 5
Report ID: 0112300
Contest Date:
Final Order: 04/12/2023
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/12/2023 | $4,297.50 | 04/26/2023 | Serious | |
Penalty | Z: Issued | 03/13/2023 | $8,595.00 | 04/26/2023 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.219(b)(1): Flywheel(s) with parts seven feet or less above floor(s) or platform(s) were not guarded in accordance with the requirements specified in 29 CFR 1910.219(b)(1)(i) through (b)(1)(iv): a) Shop Floor: On or about 10/18/22 the employer did not ensure that flywheels approximately four feet (4') above the floor and had an opening that was approximately six inches (6") in diameter. on machinery the T9 pneumatic press, was not provided with an adequate guard. b) Shop Floor: On or about 10/18/22 the employer did not ensure that fly wheels approximately six feet (6') above the floor and had an opening that was approximately six inches (10") in diameter on machinery the T7 mechanical power press, was not provided with an adequate guard.