Violation Detail
Standard Cited: 19100147 D The control of hazardous energy (lockout/tagout).
Inspection Nr: 1609392.015
Citation: 01003
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $14,502.00
Current Penalty: $8,701.20
Issuance Date: 11/22/2022
Nr Instances: 1
Nr Exposed: 10
Abatement Date: 12/05/2022
Gravity: 10
Report ID: 0522500
Contest Date:
Final Order: 12/16/2022
Related Event Code (REC): A;C;R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 12/16/2022 | $8,701.20 | 12/05/2022 | Serious | |
Penalty | Z: Issued | 11/22/2022 | $14,502.00 | 12/05/2022 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.147(d): Application of control. The established procedures for the application of energy control (the lockout or tagout procedures) was not done in sequence as required by 29 CFR 1910.147(d)(1) through (d)(6): a. In the Grinding Plant 6, on or about July 14, 2022, and at times prior, employees were exposed to machine hazards associated with moving parts and pinch points during activities such as, but not limited to, cleaning and clearing jammed product from the Conveyor Belt #3. The employer did not implement energy control application steps as the machine was not shut down or turned off to perform the servicing work [per the 1910.147(d)(2) requirements]. As a result, the remaining applicable energy control elements, involving machine isolation [(d)(3)], LOTO device application [(d)(4)], dissipation of residual energy [(d)(5)(i)], and verification of isolation [(d)(6)], were not implemented to protect employees from machine servicing hazards.