Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1590828.015
Citation: 01003
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $11,396.00
Current Penalty: $7,977.20
Issuance Date: 08/12/2022
Nr Instances: 3
Nr Exposed: 4
Abatement Date: 09/08/2022
Gravity: 5
Report ID: 0418100
Contest Date:
Final Order: 09/07/2022
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 09/07/2022 | $7,977.20 | 09/08/2022 | Serious | |
| Penalty | Z: Issued | 08/12/2022 | $11,396.00 | 09/08/2022 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section. a). In the maintenance department located at 113 Milledgeville Road, Eatonton, GA: On or about April 20, 2022, authorized employees engaged in service and or maintenance on powered industrial trucks (PIT) with 24 volts, gravity, and hydraulic energy sources were exposed to a crush- by hazard in that the employer did not develop specific written energy control procedures. b). In the Lamination Facility located at 113 Milledgeville Road, Eatonton, GA: On or about April 20, 2022, authorized employees engaged in service and or maintenance on a conveyor with 480 volts and 120 psi energy sources were exposed to an amputation and/or a pinch point hazard in that the employer did not develop specific written energy control procedures. c). In the Lamination Facility located at 113 Milledgeville Road, Eatonton, GA: On or about April 20, 2022, authorized employees engaged in service and or maintenance on glue applicator with 480 volts, 120 psi, and mechanical energy sources were exposed to an amputation and/or a pinch point hazard in that the employer did not develop specific written energy control procedures.
Translate