Standard Cited: 19100119 I01 Process safety management of highly hazardous chemicals.
Inspection Nr: 1572722.015
Citation: 01003
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $14,502.00
Current Penalty: $9,426.30
Issuance Date: 06/08/2022
Nr Instances: 5
Nr Exposed: 5
Abatement Date: 07/29/2022
Gravity: 10
Report ID: 0636900
Contest Date:
Final Order: 07/07/2022
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 07/07/2022 | $9,426.30 | 07/29/2022 | Serious | |
Penalty | Z: Issued | 06/08/2022 | $14,502.00 | 07/29/2022 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.119(i)(1): The employer did not perform a pre-startup safety review for new facilities and for modified facilities when the modification is significant enough to require a change in the process safety information: (a) Sherwin Williams - Ennis, TX: On January 11, 2022, and at times prior, the employer did not perform a pre-startup safety review after a wash ring and a new tie-in piping for mixing tank T1 were installed on 12/1/2021. (b) Sherwin Williams - Ennis, TX: On January 11, 2022, and at times prior, the employer did not perform a pre-startup safety review after a wash ring and a new tie-in piping for Mixing tank T5 were installed on 12/20/2021.. (c) Sherwin Williams - Ennis, TX: On January 11, 2022, and at times prior, the employer did not perform a pre-startup safety review after a wash ring and a new tie-in piping for Mixing tank T6 were installed on 12/2/2021. (d) Sherwin Williams - Ennis, TX: On January 11, 2022, and at times prior, the employer did not perform a pre-startup safety review after a wash ring and a new tie-in piping for Mixing tank T2 were installed on 12/16/2021. (e) Sherwin Williams - Ennis, TX: On January 11, 2022, and at times prior, the employer did not perform a pre-startup safety review after a wash ring and a new tie-in piping for Mixing tank T3 were installed on 1/4/2022.