Violation Detail
Standard Cited: 19100147 C06 II The control of hazardous energy (lockout/tagout).
Inspection Nr: 1570995.015
Citation: 01003
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 01/27/2022
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 03/18/2022
Gravity:
Report ID: 0213600
Contest Date:
Final Order: 03/22/2022
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 03/22/2022 | $0.00 | 03/18/2022 | Other | |
| Penalty | Z: Issued | 01/27/2022 | $0.00 | 02/18/2022 | Other |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.147(c)(6)(ii):The employer did not certify that periodic inspections of the energy control procedures had been performed: a) On or about 12/27/2021, in the production floor, the employer did not have written periodic inspection certifications of the lockout/tagout procedures for machinery/equipment such as, but not limited to: Variovac Optimus 35 rollstock packaging machine #1,#2 and # 3. ABATEMENT DOCUMENTATION REQUIRED