Violation Detail
Standard Cited: 19100269 C02 Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1552922.015
Citation: 01003
Citation Type: Other
Abatement Status: Corrected During Inspection
Initial Penalty: $14,502.00
Current Penalty: $8,334.00
Issuance Date: 03/08/2022
Nr Instances: 1
Nr Exposed: 5
Abatement Date:
Gravity: 10
Report ID: 0317300
Contest Date: 04/01/2022
Final Order: 12/02/2022
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | C: Contested | 02/22/2023 | $14,502.00 | Serious | ||
| Penalty | F: Formal Settlement | 12/02/2022 | $8,334.00 | Other | ||
| Penalty | Z: Issued | 03/08/2022 | $14,502.00 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.269(c)(2): The job briefing did not cover at least the following subjects: hazards associated with the job, work procedures involved, special precautions, energy-source controls, and personal protective equipment requirements: a) 1200 Block of Lodge Lane adjacent to the rear of 502 River Road, Wilmington, De 19809: On or about September 8, 2021 the job briefing did not include the means and methods for the use of fall protection.