Violation Detail
Standard Cited: 19100269 M03 I Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1543984.015
Citation: 01003
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $13,653.00
Current Penalty: $13,653.00
Issuance Date: 11/17/2021
Nr Instances: 1
Nr Exposed: 5
Abatement Date: 05/19/2023
Gravity: 10
Report ID: 0524530
Contest Date: 12/13/2021
Final Order: 04/19/2023
Related Event Code (REC): R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 04/19/2023 | $13,653.00 | 05/19/2023 | Serious | |
Penalty | C: Contested | 12/14/2021 | $13,653.00 | 01/06/2022 | Serious | |
Penalty | Z: Issued | 11/17/2021 | $13,653.00 | 01/06/2022 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.269(m)(3)(i):The employee that the employer designates pursuant to paragraph (m)(2) of this section as being in charge of the clearance did not make a request of the system operator to deenergize the particular section of line or equipment. On or about July 23, 2021, the employee that the employer designates as being in charge of clearance did not made a request of the system operator to deenergize a recloser located in a substation.