Violation Detail
Standard Cited: 19100219 C04 I Mechanical power-transmission apparatus.
Inspection Nr: 1532295.015
Citation: 01003
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $7,802.00
Current Penalty: $1,950.60
Issuance Date: 10/13/2021
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 11/08/2021
Gravity: 5
Report ID: 0316700
Contest Date:
Final Order: 10/27/2021
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 10/27/2021 | $1,950.60 | 11/08/2021 | Other | |
Penalty | Z: Issued | 10/13/2021 | $7,802.00 | 11/08/2021 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.219(c)(4)(i): Unguarded projecting shaft ends did not present a smooth edge and end and projected more than one half the diameter of the shaft: (a) Wareroom - A motor, 14.5 inches above the work platform, for the inspection conveyor on the 1D Packer, near the operator control station, had an unguarded shaft end that projected 2 inches, exposing employees to a caught-in rotating parts hazard, on or about May 21, 2021. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and state employees and their representatives were informed of this abatement.