Violation Detail
Standard Cited: 19100303 G02 I General.
This violation item has been deleted.
Inspection Nr: 1525143.015
Citation: 01003
Citation Type: Serious
Abatement Status:
Initial Penalty: $4,505.00
Current Penalty: $0.00
Issuance Date: 09/27/2021
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 10/15/2021
Gravity: 1
Report ID: 0316700
Contest Date:
Final Order: 01/20/2022
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 01/20/2022 | $0.00 | 10/15/2021 | Serious | |
Penalty | Z: Issued | 09/27/2021 | $4,505.00 | 10/15/2021 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.303(g)(2)(i):Except as elsewhere required or permitted by Subpart S of Part 1910, live parts of electric equipment operating at 50 volts or more were not guarded against accidental contact by use of approved cabinets or other forms of approved enclosures or by any of the means identified in paragraphs (A), (B), (C), and (D) of 29 CFR 1910.303(g)(2)(i): a) Natural Pack - 100 Gibraltar Road, Reading, PA 19606 - The employer did not ensure that live electrical parts were guarded or enclosed. Panel boxes were missing covers/doors, on or about April 15, 2021. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.