Violation Detail
Standard Cited: 19260405 A02 II I Wiring methods, components, and equipment for general use.
Inspection Nr: 1509063.015
Citation: 01003
Citation Type: Serious
Abatement Status: Not Completed - AD Discretion
Initial Penalty: $9,557.00
Current Penalty: $9,557.00
Issuance Date: 05/21/2021
Nr Instances: 1
Nr Exposed: 45
Abatement Date: 06/17/2021
Gravity: 10
Report ID: 0728500
Contest Date:
Final Order: 06/22/2021
Related Event Code (REC): R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 05/21/2021 | $9,557.00 | 06/17/2021 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1926.405(a)(2)(ii)(I):Flexible cords and cables used for temporary wiring were not protected from damage: At a commercial worksite located at 3115 Troost Ave, KC MO -- flexible cords used for temporary wiring were fed through doorways, broken windows, and outside where they were walked on. This exposed the cords to being damaged and causing employees to be exposed to electrical shock and/or burns. This was documented on or about 01/07/2021.