Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1509043.015
Citation: 01003
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $13,653.00
Current Penalty: $5,000.00
Issuance Date: 03/15/2021
Nr Instances: 1
Nr Exposed: 25
Abatement Date: 04/08/2021
Gravity: 10
Report ID: 0522000
Contest Date: 04/05/2021
Final Order: 06/08/2022
Related Event Code (REC): R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 06/08/2022 | $5,000.00 | 04/08/2021 | Other | |
Penalty | C: Contested | 04/09/2021 | $13,653.00 | 04/08/2021 | Serious | |
Penalty | Z: Issued | 03/15/2021 | $13,653.00 | 04/08/2021 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.147(c)(6)(i):The employer shall conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirements of this standard are being followed. On or about 1/07/2021 the employer did not conduct periodic inspection of the energy control procedures annually, for equipment such as but not limited to; Mylar Former 700, Paint Line Dryoff oven, EHRT HP 160 and RF 103 Rollform. The procedures posted on the equipment were from December of 2019, the procedures were changed in January of 2021 but no certification was provided showing the change were part of a periodic inspection of the procedures.