Violation Detail
Standard Cited: 19260453 B02 IV Aerial lifts.
Inspection Nr: 1503544.015
Citation: 01003
Citation Type: Serious
Abatement Date: 04/06/2021 2
Initial Penalty: $6,827.00
Current Penalty: $6,827.00
Issuance Date: 03/11/2021
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity: 5
Report ID: 0316700
Contest Date:
Final Order: 04/16/2021
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 03/11/2021 | $6,827.00 | 04/06/2021 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1926.453(b)(2)(iv): Employees working in an aerial lift were not standing firmly on the floor of the basket: (a) Northwest Corner of Two-Story Extension on Front of Building - An employee worked installing and integrating a rooftop telecommunications antennae from a JLG 1350SJP Ultra Boom aerial lift. The employee stood on the midrail of the aerial lift rather than firmly on the floor of the basket, exposing the employee to the hazard of falling to a lower level, on or about November 19, 2020. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.