Violation Detail
Standard Cited: 19100269 L03 III Electric Power Generation, Transmission, and Distribution.
This violation item has been deleted.
Inspection Nr: 1500967.015
Citation: 01003
Citation Type: Serious
Abatement Status:
Initial Penalty: $13,653.00
Current Penalty: $0.00
Issuance Date: 03/24/2021
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 05/10/2021
Gravity: 10
Report ID: 0627700
Contest Date:
Final Order: 04/19/2021
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/19/2021 | $0.00 | 05/10/2021 | Serious | |
Penalty | Z: Issued | 03/24/2021 | $13,653.00 | 05/10/2021 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.269(l)(3)(iii): The employer did not ensure that no employee approached or took any conductive object closer to exposed energized parts than the employer's established minimum approach distance, unless provisions described in (l) (3) (iii) (A) - (C) were followed: On or about November 2nd, 2020, and at times prior thereto, the employer failed to ensure employees did not take or utilize conductive objects within the minimum approach distance of energized parts, exposing employees to electrical shock hazards.