Violation Detail
Standard Cited: 19100119 J05 Process safety management of highly hazardous chemicals.
Inspection Nr: 1499644.015
Citation: 01003
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $13,653.00
Current Penalty: $13,653.00
Issuance Date: 03/25/2021
Nr Instances: 3
Nr Exposed: 12
Abatement Date: 04/29/2021
Gravity: 10
Report ID: 0626600
Contest Date: 04/16/2021
Final Order: 10/19/2022
Related Event Code (REC):
Emphasis:
Substance: 0170
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 10/19/2022 | $13,653.00 | 04/29/2021 | Other | |
| Penalty | C: Contested | 04/16/2021 | $13,653.00 | 04/29/2021 | Serious | |
| Penalty | Z: Issued | 03/25/2021 | $13,653.00 | 04/29/2021 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.119(j)(5):The employer did not correct deficiencies in equipment that were outside acceptable limits (defined by the process safety information on paragraph (d) of this section) in a safe and timely manner when necessary means where taken to assure safe operation. (a)On or about October 27, 2020 in the Powerhouse of the Anheuser-Busch Houston Brewery the employer did not correct deficiencies of the inlet valve to the #3 High Pressure Receiver in a timely manner. (b) On or about October 27, 2020 in the EVAP Deck area on the roof of the Powerhouse of the Anheuser-Busch Houston Brewery the employer did not correct deficiencies in the ammonia piping down comer, piping going to the pump out system and other critical piping to the receivers , in a timely manner. (c) On or about October 27, 2020 in the EVAP Deck area on the roof of the Powerhouse of the Anheuser-Busch Houston Brewery the employer did not correct deficiencies in electrical and controls system, in that there were broken and open conduit with electrical wires visible inside for the ammonia system in a timely manner.