Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1497231.015
Citation: 01003
Citation Type: Serious
Abatement Date: 03/31/2021 2
Initial Penalty: $9,557.00
Current Penalty: $6,700.00
Issuance Date: 03/05/2021
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity: 10
Report ID: 0214500
Contest Date:
Final Order: 04/05/2021
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/05/2021 | $6,700.00 | 03/31/2021 | Serious | |
Penalty | Z: Issued | 03/05/2021 | $9,557.00 | 03/31/2021 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: a) At the facility, 271 Mayhill Street Saddle brook, NJ - Out packer Machine N3 Staples N lines: Energy control procedures were not utilized for the control of potentially hazardous energy while an employee was engaged in reinstalling the pulley for the conveyor belt, on or about 10/5/20. Inspection was conducted on 10/6/20