Violation Detail
Standard Cited: 19260451 F06 General requirements.
Inspection Nr: 1497090.015
Citation: 01003
Citation Type: Serious
Abatement Date: 01/05/2021 5
Initial Penalty: $13,494.00
Current Penalty: $13,494.00
Issuance Date: 12/18/2020
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC): A
Gravity: 10
Report ID: 0523300
Contest Date:
Final Order: 02/02/2021
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 12/18/2020 | $13,494.00 | 01/05/2021 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1926.451(f)(6):Scaffolds were erected, used, dismantled, altered, or moved such that they, or any conductive material handled on them, could have come closer than the minimum distances established for specific voltages as set forth in the table in subparagraph (f)(6). a) On or about October 13, 2020, at the previously addressed jobsite, employees were erecting a scaffold with aluminum supports prior to siding a family home when a support contacted a live uninsulated primary power line above the ground resulting in an electrocution. Abatement certification is required for this item in accordance with the requirements of 29 CFR 1903.19(c).