Violation Detail
Standard Cited: 19260602 C01 II Material handling equipment.
Inspection Nr: 1473624.015
Citation: 01003
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $5,398.00
Current Penalty: $3,778.60
Issuance Date: 07/01/2020
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 07/08/2020
Gravity: 10
Report ID: 0625400
Contest Date:
Final Order: 09/01/2020
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 09/01/2020 | $3,778.60 | 07/08/2020 | Serious | |
| Penalty | Z: Issued | 07/01/2020 | $5,398.00 | 07/08/2020 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1926.602(c)(1)(ii): Modifications or additions which affect the capacity or safe operation of the equipment were made without the manufacturer's written approval. On or about 28 April 2020, and at times prior thereto, a telehandler forklift was used to lift upright a newly welded steel arch consisting of two curved hollow steel sections as the first piece for a dome in which the ironworkers were exposed to the hazard of being struck by one or both of the arch sections. To raise the arch, a fiber web sling was attached to one fork of the forklift in the manner of free rigging without prior written approval from the manufacturer.
Translate