Violation Detail
Standard Cited: 19260652 D02 Requirements for protective systems.
Inspection Nr: 1468999.015
Citation: 01003
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $8,501.00
Current Penalty: $5,950.70
Issuance Date: 05/07/2020
Nr Instances: 1
Nr Exposed: 1
Abatement Date:
Gravity: 10
Report ID: 0522000
Contest Date:
Final Order: 06/03/2020
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 06/03/2020 | $5,950.70 | Serious | ||
Penalty | Z: Issued | 05/07/2020 | $8,501.00 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1926.652(d)(2): Manufactured materials and equipment used for protective systems shall be used and maintained in a manner that is consistent with the recommendations of the manufacturer, and in a manner that will prevent employee exposure to hazards. On March 11, 2020, located in an excavation on a residential construction site, an employee working in an excavation 9 in-depth without adequate protection against cave-ins, in that the walls of the excavation were not properly shored per Efficiency Production installation and procedures of the hydraulic shoring system to protect against collapse.