Violation Detail
Standard Cited: 19260416 A01 General requirements.
Inspection Nr: 1462563.015
Citation: 01003
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $4,048.00
Current Penalty: $2,833.70
Issuance Date: 08/07/2020
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC): A
Gravity: 10
Report ID: 0216000
Contest Date: 09/17/2020
Final Order: 04/26/2021
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | C: Contested | 04/19/2022 | $4,048.00 | Serious | ||
Penalty | F: Formal Settlement | 04/26/2021 | $2,833.70 | Serious | ||
Penalty | Z: Issued | 08/07/2020 | $4,048.00 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1926.416(a)(1): Employees were permitted to work in proximity to electric power circuits and were not protected against electric shock by de-energizing and grounding the circuits or effectively guarding the circuits by insulation or other means: Location: 164 Union Ave New Rochelle NY 10801 a) On or about February 12, 2020, an employee was electrocuted when the boom of the aerial lift made contact with insulated overhead lines. The insulation cracked under the strain of the boom.