Violation Detail
Standard Cited: 19260454 A Training requirements.
Inspection Nr: 1461688.015
Citation: 01003
Citation Type: Serious
Abatement Status: Not Completed - AD Discretion
Initial Penalty: $5,398.00
Current Penalty: $3,000.00
Issuance Date: 05/18/2020
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 11/30/2020
Gravity: 10
Report ID: 0418800
Contest Date: 06/08/2020
Final Order: 11/09/2020
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | J: ALJ Decision | 11/09/2020 | $3,000.00 | 11/30/2020 | Serious | |
| Penalty | C: Contested | 06/15/2020 | $5,398.00 | 06/12/2020 | Serious | |
| Penalty | Z: Issued | 05/18/2020 | $5,398.00 | 06/12/2020 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1926.454(a): The employer shall have each employee who performs work while on a scaffold trained by a person qualified in the subject matter to recognize the hazards associated with the type of scaffold being used and to understand the procedures to control or minimize those hazards. The training shall include the following areas, as applicable: At 12501 NE 13th Ave, North Miami Beach, Florida 33161: On or about 11/20/2019, and at times prior, the employer failed to ensure subcontractors and employees of the company were trained in the recognition and avoidance of fall hazards, prior to permitting workers to operate an 800AJ aerial lift.
Translate