Violation Detail
Standard Cited: 19100107 C04 Spray finishing using flammable and combustible materials.
Inspection Nr: 1459942.015
Citation: 01003
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $9,639.00
Current Penalty: $4,000.00
Issuance Date: 03/27/2020
Nr Instances: 4
Nr Exposed: 1
Abatement Date:
Gravity: 5
Report ID: 0134000
Contest Date:
Final Order: 04/29/2020
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/29/2020 | $4,000.00 | Serious | ||
Penalty | Z: Issued | 03/27/2020 | $9,639.00 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.107(c)(4): Electrical wiring and equipment did not conform to the provisions of this paragraph and were not otherwise in accordance with subpart S of this part (Reference: 29 CFR 1910.307, Hazardous Locations): Location: Spray room A) On or about January 31, 2020, electrical outlets located in the spray area were not intrinsically safe. B) On or about January 31, 2020, the circuit breaker located in the spray area was not intrinsically safe. C) On or about January 31, 2020, the overhead Saturn crane was not intrinsically safe. D) On or about January 31, 2020, the electric door opener was not intrinsically safe.