Violation Detail
Standard Cited: 19100119 D03 I B Process safety management of highly hazardous chemicals.
This violation item has been deleted.
Inspection Nr: 1450096.015
Citation: 01003
Citation Type: Serious
Abatement Status:
Initial Penalty: $9,639.00
Current Penalty: $0.00
Issuance Date: 06/05/2020
Nr Instances: 1
Nr Exposed: 20
Abatement Date: 07/10/2020
Gravity: 5
Report ID: 0111700
Contest Date: 06/29/2020
Final Order: 01/10/2022
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 01/10/2022 | $0.00 | 07/10/2020 | Serious | |
Penalty | C: Contested | 08/05/2020 | $9,639.00 | 07/10/2020 | Serious | |
Penalty | Z: Issued | 06/05/2020 | $9,639.00 | 07/10/2020 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.119(d)(3)(i)(B): The employer's piping and instrument diagrams (P&IDs) were not accurate and did not represent equipment that was existing and was part of the process. a. Churn Room - On or about December 10, 2019, the vessel piping P&IDs were not accurate in that vital components were: - Missing: i) C10 Lower Piping Plan - Temperature gauge (steam out side); ii) C10 Lower Piping Plan - Temperature gauge (city supply side); iii) C10 Lower Piping Plan - Valve between the steam trap and temperature gauge (steam out side); iv) Solvent Manifold #1 Wall Elevation South Wall-Mezzanine Level - Fusible link safety valve between solvent meter and valve; - Misplaced: v) C7 Lower Piping Plan - Dampener; vi) C7 Lower Piping Plan - Fusible link safety valve; and vii) C10 Lower Piping Plan - Fusible link safety valve.