Violation Detail
Standard Cited: 19100305 B02 I Wiring methods, components, and equipment for general use.
Inspection Nr: 1420778.015
Citation: 01003
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,293.00
Current Penalty: $3,966.00
Issuance Date: 09/20/2019
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 10/17/2019
Gravity: 5
Report ID: 0316700
Contest Date: 11/12/2019
Final Order: 03/09/2020
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 03/09/2020 | $3,966.00 | 10/17/2019 | Serious | |
Penalty | C: Contested | 11/13/2019 | $7,293.00 | 10/17/2019 | Serious | |
Penalty | Z: Issued | 09/20/2019 | $7,293.00 | 10/17/2019 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.305(b)(2)(i): Pull boxes, junction boxes, and fittings were not provided with covers approved for the purpose: (a) BIN 72, NEAR ENTRY DOOR - Employees performed grain bin operations near the entry door to bin 72, and the employer had not installed a cover on the junction box for the bin unload receptacle, which thereby exposed employees to live 240 volt electrical conductors, on or about August 5, 2019. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.