Violation Detail
Standard Cited: 19100303 G02 II General.
Inspection Nr: 1412074.015
Citation: 01003
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $11,252.00
Current Penalty: $1,000.00
Issuance Date: 12/11/2019
Nr Instances: 1
Nr Exposed: 5
Abatement Date: 12/23/2019
Gravity:
Report ID: 0524200
Contest Date:
Final Order: 01/02/2020
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 01/02/2020 | $1,000.00 | 12/23/2019 | Other | |
Penalty | Z: Issued | 12/11/2019 | $11,252.00 | 12/23/2019 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.303(g)(2)(ii): In locations where electric equipment was likely to be exposed to physical damage, enclosures or guards were not so arranged and of such strength as to prevent such damage: (a) Riveting Department - On July 2, 2019, the employer did not ensure that live conductors were enclosed or guarded on the electrical equipment on the left side of the Chicago Rivet and Machine Co. machine number 912-9841-SS. In accordance with the requirements of 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete and must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase, or repair of the equipment, photographic or video evidence of abatement, or other written records.