Standard Cited: 19260964 B01
This violation item has been deleted.
Inspection Nr: 1402155.015
Citation: 01003
Citation Type: Serious
Abatement Status:
Initial Penalty: $11,934.00
Current Penalty: $0.00
Issuance Date: 11/18/2019
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 11/22/2019
Gravity: 10
Report ID: 0213900
Contest Date: 12/12/2019
Final Order: 07/12/2021
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | J: ALJ Decision | 07/12/2021 | $0.00 | 11/22/2019 | Serious | |
Penalty | C: Contested | 12/13/2019 | $11,934.00 | 11/22/2019 | Serious | |
Penalty | Z: Issued | 11/18/2019 | $11,934.00 | 11/22/2019 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1926.964(b)(1): The employer did not use the tension stringing method, barrier, or other equivalent means to minimize the possibility that conductors or cables the employees were installing or removing would contact energized power lines or equipment: a- Newman Springs Road & GSP Exit 109 North Entranceway, Lincroft NJ: The tension stringing method, barriers, or other equivalent measures were not utilized by employees when they were installing a messenger cable near energized power lines. On or about 05/20/19. NOTE: IN ADDITION TO ABATEMENT CERTIFICATION, THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT DOCUMENTATION FOR THIS ITEM, FAILURE TO COMPLY WILL RESULT IN AN ADDITIONAL PENALTY OF $1000.00 IN ACCORDANCE WITH 29 CFR 1903.19.