Violation Detail
Standard Cited: 19100119 J02 Process safety management of highly hazardous chemicals.
Inspection Nr: 1391907.015
Citation: 01003
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $13,260.00
Current Penalty: $5,304.00
Issuance Date: 08/16/2019
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 09/20/2019
Gravity:
Report ID: 0522000
Contest Date:
Final Order: 08/29/2019
Related Event Code (REC): C
Emphasis:
Substance: 0120
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/29/2019 | $5,304.00 | 09/20/2019 | Other | |
Penalty | Z: Issued | 08/16/2019 | $13,260.00 | 09/20/2019 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.119(j)(2): Written procedures. The employer shall establish and implement written procedures to maintain the on-going integrity of process equipment. a) On or about 2/21/2019, in the Building 9 Control Room, the employer did not establish and implement written procedures to maintain the ventilation system Positive Pressure Unit (PPU).