Violation Detail
Standard Cited: 19260404 F06 Wiring design and protection.
Inspection Nr: 1390472.015
Citation: 01003
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $4,168.00
Current Penalty: $4,168.00
Issuance Date: 09/13/2019
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC):
Gravity: 5
Report ID: 0215000
Contest Date:
Final Order: 10/16/2019
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 09/13/2019 | $4,168.00 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1926.404(f)(6): The path to ground from circuits, equipment, or enclosures was not permanent and continuous. a) House driveway: Employees used an electric powered demolition hammer to break concrete pavement. The demolition hammer was connected to an extension cord, which was routed to an outlet device in the basement. The extension cord was missing a ground pin. On or about 04/02/19.