Violation Detail
Standard Cited: 19100303 B02 General.
Inspection Nr: 1389892.015
Citation: 01003
Citation Type: Other
Abatement Status: Corrected During Inspection
Initial Penalty: $8,335.00
Current Penalty: $0.00
Issuance Date: 08/01/2019
Nr Instances: 1
Nr Exposed: 10
Abatement Date:
Gravity:
Report ID: 0521400
Contest Date:
Final Order: 08/13/2019
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 08/13/2019 | $0.00 | Other | ||
| Penalty | Z: Issued | 08/01/2019 | $8,335.00 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.303(b)(2): Listed or labeled electrical equipment was not used or installed in accordance with instructions included in the listing or labeling: North, fabrication, supervisor's desk, two relocatable power taps - on or about April 9, 2019, employees were exposed to fire and electrical hazards where the energized relocatable power taps were used in an industrial setting as substitutes for fixed wiring of electronic devices. Relocatable power taps was not directly connected to permanently installed branch-circuit receptacle outlets and were connected in-series to each other and powered by an extension cord. One relocatable power tap was affixed to a desk with a screw drilled through its enclosure. This equipment is not intended for such use. There is no abatement certification or documentation required for this item.
Translate