Violation Detail
Standard Cited: 19100107 L04 I Spray finishing using flammable and combustible materials.
Inspection Nr: 1379024.015
Citation: 01003
Citation Type: Serious
Abatement Date: 09/30/2019 2
Initial Penalty: $9,472.00
Current Penalty: $5,700.00
Issuance Date: 08/06/2019
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC): C
Gravity: 5
Report ID: 0418100
Contest Date:
Final Order: 08/19/2019
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/19/2019 | $5,700.00 | 09/30/2019 | Serious | |
Penalty | Z: Issued | 08/06/2019 | $9,472.00 | 08/30/2019 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.107(l)(4)(i): Operation and maintenance. All areas shall be kept free of the accumulation of powder coating dusts, particularly such horizontal surfaces as ledges, beams, pipes, hoods, booths, and floors. Optima Stantron Corp. Div of Elma Electronic Inc., Lawrenceville, GA - On or about 02/14/2019, the areas where the painting was performed, had explosive dust in the paint area, floors, inside the powder coating booth, on top of booth and on masonry walls, exposing employees to fire hazards.