Violation Detail
Standard Cited: 19100147 C04 II B The control of hazardous energy (lockout/tagout).
Inspection Nr: 1364710.015
Citation: 01003
Citation Type: Serious
Abatement Date: 07/08/2019 2
Initial Penalty: $13,260.00
Current Penalty: $9,945.00
Issuance Date: 06/03/2019
Nr Instances: 5
Nr Exposed: 13
Related Event Code (REC): A
Gravity: 10
Report ID: 0626700
Contest Date:
Final Order: 06/25/2019
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 06/25/2019 | $9,945.00 | 07/08/2019 | Serious | |
Penalty | Z: Issued | 06/03/2019 | $13,260.00 | 07/08/2019 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.147(c)(4)(ii)(B): The energy control procedures did not clearly and specifically outline the steps for shutting down, isolating, blocking and securing machines or equipment to control hazardous energy: a) In the Forge Shop, where written energy control procedures for components of the HT Furnace inadvertently failed to clearly outline all of the steps to be utilized for the control of hazardous energy.