Violation Detail
Standard Cited: 19260850 A Preparatory operations.
Inspection Nr: 1357846.015
Citation: 01003
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $3,978.00
Current Penalty: $2,784.60
Issuance Date: 04/24/2019
Nr Instances: 1
Nr Exposed: 3
Abatement Date:
Gravity: 10
Report ID: 0419700
Contest Date:
Final Order: 05/17/2019
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 05/17/2019 | $2,784.60 | Serious | ||
| Penalty | Z: Issued | 04/24/2019 | $3,978.00 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1926.850(a): Evidence in writing was not available that an engineering survey performed by a competent person had been performed prior to permitting employee(s) to start demolition operations: a) On or about October 29, 2018, the employer failed to ensure that an engineering survey was performed by a competent person to determine the condition and possibility of unplanned collapse of any portion of the structure, before allowing employees to conduct demolition activities, to include removal of roofing material while walking and working on the roof of a building damaged by hurricane wind forces.