Violation Detail
Standard Cited: 19100107 B05 I Spray finishing using flammable and combustible materials.
Inspection Nr: 1355961.015
Citation: 01003
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $3,978.00
Current Penalty: $2,500.00
Issuance Date: 03/11/2019
Nr Instances: 1
Nr Exposed: 5
Abatement Date: 03/21/2019
Gravity: 1
Report ID: 0627500
Contest Date:
Final Order: 03/21/2019
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/21/2019 | $2,500.00 | 03/21/2019 | Serious | |
Penalty | Z: Issued | 03/11/2019 | $3,978.00 | 03/21/2019 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.107(b)(5)(i): The average air speed over the open face of the paint spray booth was less than 100 linear feet per minute. On or about October 26, 2018, employees working in the spray room were exposed to health hazards due to the spray booth having an average air speed at the open face of at 76 linear feet per minute.