Violation Detail
Standard Cited: 19100037 A03 Maintenance, safeguards, and operational features for exit routes.
Inspection Nr: 1349079.015
Citation: 01003
Citation Type: Other
Abatement Status: Corrected During Inspection
Initial Penalty: $5,543.00
Current Penalty: $3,000.00
Issuance Date: 01/04/2019
Nr Instances: 1
Nr Exposed: 1
Abatement Date:
Gravity:
Report ID: 0418100
Contest Date:
Final Order: 01/24/2019
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 01/24/2019 | $3,000.00 | Other | ||
Penalty | Z: Issued | 01/04/2019 | $5,543.00 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.37(a)(3): Exit route(s) were not kept free and unobstructed. On or about 9/26/18, egress routes at operators work areas were blocked by product stored at the area. Egress routes ranged from 16 in. to 22 in..