Violation Detail
Standard Cited: 19260451 F06 General requirements.
Inspection Nr: 1335739.015
Citation: 01003
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $5,691.00
Current Penalty: $5,691.00
Issuance Date: 01/14/2019
Nr Instances: 1
Nr Exposed: 1
Abatement Date:
Gravity: 10
Report ID: 0524200
Contest Date:
Final Order: 02/14/2019
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 01/14/2019 | $5,691.00 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1926.451(f)(6): Scaffolds were erected, used, dismantled, altered, or moved such that they, or any conductive material handled on them, could have come closer than the minimum distances established for specific voltages as set forth in the table in subparagraph (f)(6): a) On or about, July 26, 2018, employees were not protected against accidental contact with energized overhead power lines while performing masonry work from a tubular welded frame scaffold platform. The overhead power lines consisted of primary lines having a voltage rating of 7200 V. No abatement certification or documentation is required for this item.