Standard Cited: 19100303 G01 II General.
Inspection Nr: 1305746.015
Citation: 01003
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $6,220.00
Current Penalty: $3,251.00
Issuance Date: 04/30/2018
Nr Instances: 3
Nr Exposed: 2
Abatement Date: 06/15/2018
Gravity: 5
Report ID: 0522000
Contest Date:
Final Order: 05/22/2018
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 05/22/2018 | $3,251.00 | 06/15/2018 | Serious | |
Penalty | Z: Issued | 04/30/2018 | $6,220.00 | 06/15/2018 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.303(g)(1)(ii): The required working space about electric equipment rated 600 volts, nominal, or less to ground, was used for storage: a) On or about 4/2/2018, access to the Dunnage Hold Area breaker box was obstructed in that forklifts are parked in front of the breaker box and a forklift charger was positioned on the north side of the breaker box. b) On or about 4/24/2018, access to the Dunnage Hold Area breaker box was obstructed in that dunnage was positioned in front of the breaker box and a forklift charger was positioned on the north side of the breaker box. c) On or about 4/24/2018, access to the breaker box near Door 23 and 24 was obstructed in that boxes of merchandise were positioned in front of the breaker box.