Violation Detail
Standard Cited: 19100184 E01 Slings.
Inspection Nr: 1302232.015
Citation: 01003
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $9,959.00
Current Penalty: $4,000.00
Issuance Date: 06/20/2018
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 07/17/2018
Gravity:
Report ID: 0626300
Contest Date:
Final Order: 07/26/2018
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 07/26/2018 | $4,000.00 | 07/17/2018 | Other | |
Penalty | Z: Issued | 06/20/2018 | $9,959.00 | 07/17/2018 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.184(e)(1): Alloy steel sling(s) did not have permanently affixed durable identification stating size, grade, rated capacity, and reach: a. This violation was discovered on March 19, 2018; where the employer did not ensure that four (4) alloy steel chain slings attached to 2-ton overhead crane in production department had permanently affixed tags stating size, grade, rated capacity, and reach.