Violation Detail
Standard Cited: 19100212 A03 II General requirements for all machines.
Inspection Nr: 1295818.015
Citation: 01003
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $9,054.00
Current Penalty: $9,000.00
Issuance Date: 05/25/2018
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 06/21/2018
Gravity: 10
Report ID: 0336000
Contest Date:
Final Order: 06/13/2018
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 06/13/2018 | $9,000.00 | 06/21/2018 | Serious | |
Penalty | Z: Issued | 05/25/2018 | $9,054.00 | 06/21/2018 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.212(a)(3)(ii): Point(s) of operation of machinery were not guarded to prevent employee(s) from having any part of their body in the danger zone(s) during operating cycle(s): A.) Northeast Industrial Manufacturing, Inc. - On or about 2/9/18, and at times prior thereto, machine guarding was not used to protect employees from the point of operation on the Cincinnati press brake.