Violation Detail
Standard Cited: 19100037 A03 Maintenance, safeguards, and operational features for exit routes.
Inspection Nr: 1281432.015
Citation: 01003
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $7,391.00
Current Penalty: $4,434.60
Issuance Date: 03/07/2018
Nr Instances: 2
Nr Exposed: 4
Related Event Code (REC):
Gravity: 5
Report ID: 0420600
Contest Date:
Final Order: 04/05/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/05/2018 | $4,434.60 | Serious | ||
Penalty | Z: Issued | 03/07/2018 | $7,391.00 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.37(a)(3): Exit route(s) were not kept free and unobstructed: a) At the warehouse the exit door by dock 20-21 the door is blocked by a fan preventing employees to escape in case of an emergency, as observed on or about 12/05/2017. b) At the warehouse the exit door by dock 1 was locked preventing employees to escape in case of an emergency, as observed on or about 12/05/2017.