Violation Detail
Standard Cited: 19100333 C03 III A Selection and use of work practices
This violation item has been deleted.
Inspection Nr: 1275237.015
Citation: 01003
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $9,054.00
Current Penalty: $0.00
Issuance Date: 03/29/2018
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC): A
Gravity: 10
Report ID: 0111700
Contest Date: 04/27/2018
Final Order: 08/27/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 08/27/2018 | $0.00 | Serious | ||
Penalty | C: Contested | 05/03/2018 | $9,054.00 | Serious | ||
Penalty | Z: Issued | 03/29/2018 | $9,054.00 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.333(c)(3)(iii)(A): Vehicles or mechanical equipment capable of having parts of their structures elevated near energized overhead lines were not operated so that a clearance of 10 feet (305 cm) was maintained: Location: Building A-2 162-185 Cannongate Road On or about 11/2/17, the employer did not protect an employee performing painting operations from an aerial lift from an electrical shock hazard. The performance of this painting operation brought the employee in contact with a 19,900 volt phase to ground overhead power line.