Violation Detail
Standard Cited: 19100303 B02 General.
Inspection Nr: 1268189.015
Citation: 01003
Citation Type: Other
Abatement Date: 3
Initial Penalty: $4,617.00
Current Penalty: $4,617.00
Issuance Date: 11/07/2017
Nr Instances: 2
Nr Exposed: 2
Related Event Code (REC):
Gravity:
Report ID: 0215800
Contest Date:
Final Order: 12/01/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 12/01/2017 | $4,617.00 | Other | ||
Penalty | Z: Issued | 11/07/2017 | $4,617.00 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.303(b)(2): Listed or labeled electrical equipment was not used or installed in accordance with instructions included in the listing or labeling: a) Salvage Area, on or about 10/4/17: A relocatable power tap (RPT) providing current to two extension cords to charge the Columbia chariot and a JLG lift, were not in accordance with the listing and labeling and were being used as permanent wiring. b) Bottle Room, upstairs, on or about 10/4/17: A relocatable power tap (RPT) providing current to a Dayton pedestal fan was not in accordance with the listing and labeling and was being used as permanent wiring.