Standard Cited: 19100269 L05 I Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1262651.015
Citation: 01003
Citation Type: Serious
Abatement Date: 02/12/2018 2
Initial Penalty: $12,934.00
Current Penalty: $12,934.00
Issuance Date: 01/19/2018
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC): A
Gravity: 10
Report ID: 0626000
Contest Date: 02/13/2018
Final Order: 05/18/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 05/18/2018 | $12,934.00 | 02/12/2018 | Serious | |
Penalty | C: Contested | 02/16/2018 | $12,934.00 | 02/12/2018 | Serious | |
Penalty | Z: Issued | 01/19/2018 | $12,934.00 | 02/12/2018 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.269(l)(5)(i): The employer did not ensure that each employee, to the extent that other safety-related conditions at the worksite permit, works in a position from which a slip or shock will not bring the employee's body into contact with exposed, un-insulated parts energized at a potential different from the employee's. Employee was removing insulated covers from energized parts and was not prevented from working in a position from which a slip or shock would bring the employee's body into contact with the exposed un-insulated energized part.